Simatek > realisations

Project description
This was our biggest challenge so far. We undertook the launch of an entire factory that was relocated from Italy to Poland for a leading manufacturer of semi-trailers.
 
Examples of lines we ran
 
KTL line for Cataphoresis - 12 bathtubs with chemicals, about 80 pumps, 8 trolleys that ran under the hall ceiling and transported trailer frames to individual bathtubs
Furnace line - a line for heating and then cooling painted frames, several conveyors, heating and cooling system, etc.
Painting lines - Robotic lines for painting frames by spraying
 
Scope of work
We had to launch over 20 control systems, often interconnected via Ethernet or Profibus.
 
The entire system was in about 100 control cabinets
 
An additional difficulty was the modifications resulting from changes in the functionality of the machines, different arrangement of the machines, etc.
 
 
 
Our main tasks
 
  • Software security for HMI panels and PLCs in Italy
  • Securing technical documentation
  • Launch of the production line and control modifications
Client

Poland, Suwalska 25/27
93-342 Łódź


NIP: 725 179 61 29

 +48 601 075 740

 www@simatek.pl

Copryight by SIMATEK 2020 | projekt: www.wpoldodziewiatej.pl
wpoldodziewiatej