Project description

Adapting the machines to health and safety requirements was based on an audit of the production lines. Creating a report and then, based on this document, modernizing machines for safety

Scope of work
  • Conducting an audit and creating a report
  • Modernization of the line for safety:
    • replacement of safety relays
    • two-channel circuit breakers
    • installation of electric locks at the finish
    • installation of light curtains
  • Reprogramming Omron G9SP safety controller
  • Update of electrical diagrams
Client

[2] getimagesize(): Peer certificate CN=`*.home.pl' did not match expected CN=`simatek.pl'
Fatal error on line 87 in file /simatek/web/mods/21/w_21.php

[2] getimagesize(): Failed to enable crypto
Fatal error on line 87 in file /simatek/web/mods/21/w_21.php

[2] getimagesize(https://simatek.pl/img/tlo_107_zeufz3q9ydkcz3f1nem3mebdmdndz6jdmeqfz3m9.png): failed to open stream: operation failed
Fatal error on line 87 in file /simatek/web/mods/21/w_21.php

[2] Division by zero
Fatal error on line 94 in file /simatek/web/mods/21/w_21.php

Poland, Suwalska 25/27
93-342 Łódź


NIP: 725 179 61 29

 +48 601 075 740

 www@simatek.pl

Copryight by SIMATEK 2020 | projekt: www.wpoldodziewiatej.pl
wpoldodziewiatej